Twin 5 Plus

Twin 5 Plus

Elevate charging with the Alfen Twin 5 Plus

Check it on Alfen Website

Charging stations

Component Subframe and Electrical Layout – Twin 5 Plus 25D60

Introduction of second supplier for Twin 5 Plus energy meters

Electrical installation

How much energy does a charging station consume in standby mode?

Connecting the Alfen Twin 5 to a Grid Without Neutral in Belgium

Error Codes

What does Error code 215 mean?

What does Error code 115 mean?

What does Error code 114 mean?

Firmware AHP-Platform

AHP-Firmware version 2.0.0

Release notes - Firmware updates Alfen Hardware Platform (AHP)

AHP-Firmware version 2.7.0

AHP-Firmware version 2.4.0

AHP-Firmware version 2.1.0

Consumer

Does my charger have a MID meter?

ACE Service Installer

How can I change the logo on the display of my charger locally?

Twin 5 Plus

Introduction of second supplier for Twin 5 Plus energy meters

Troubleshooting

What does Error code 215 mean?

What is Anti-Tamper Detection (AHP-Platform)?

SCN Cross Platform Compatibility

What does Error code 115 mean?

What does Error code 114 mean?

Backoffice

Changing the Backoffice of a charger on the AHP-Platform

How can I change the logo on the display of the charging station remotely?

Configuration

Changing the Backoffice of a charger on the AHP-Platform

How can I change the logo on the display of the charging station remotely?

How can I change the logo on the display of my charger locally?

SCN Cross Platform Compatibility

How to change the brightness of the display on an AHP-Charger

Service

RCD tripping range for Alfen Twin Chargers

Spare Parts

Cable Set GSM Antenna Twin 5 Plus

Fuse CH10x38 gG 20A/400V

T2 socket Eve Double

Cable RCCB kWh Twin AHP

Actuator T2 Socket Lock